Transformer Overload Study

Maximize Transformer Load Capability using Existing Cooling System

WEIDMANN engineers have years of experience with a wide variety of transformer designs, manufacturers, and materials. This provides us with the ability to analyze and evaluate loading capabilities of both old and new transformers utilizing proprietary WEIDMANN software and other analytical tools.  A Transformer Overload Study  will give utilities a better understanding of their potential system capacity.

 

Benefits
  • Improve asset utilization
  • Maximize overall system load capability
  • Reduce capital spending
  • Extend transformer life cycle

 

Features
  • Detailed load study and thermal analysis for normal and contingent operation
  • Estimation of maximum loading above stated nameplate capacity  considering operating criteria and environment

 

Application
  • Power transformers

icon Transformer Overload Study (68.14 kB)

  • Other WEIDMANN Websites

    WEIDMANN

    ELECTRICAL

    www.weidmann-electrical.com

     

    WEIDMANN

    ELECTROMAGNETIC SERVICES

    www.weidmanntech.com

     

    WEIDMANN

    MALYN PAPER MILL

    www.weidmann-mpm.com

     
  •  
  • News

    WEIDMANN's InsuLogix® H
    monitors World Cup
    stadium transformers

    READ FULL ARTICLE 

    more...

     

     
  •  
  • Courses & Conferences

    WEIDMANN Annual Technical
    Conference

    NEW LOCATION
    Savannah, GA
    October 2-5, 2017 

    more...

     

     
  •  

Login Form